Understanding exactly what happens during an exterior cladding installation in Saffron Walden helps you plan properly, ask the right questions and know whether the job has been done correctly.
Call any time. Calls are answered day and night and passed straight to our roofers.
Exterior cladding is a protective layer of boards or panels fixed to the outside face of a building's walls. It shields the structure from rain, wind and frost, improves thermal performance, and transforms the appearance of a property.
A cladding project is more involved than it looks from the outside. Here is what a properly run job looks like from start to finish.
Before any material is ordered or priced, the existing wall needs to be assessed. This means looking at the substrate (masonry, timber frame, insulated block or render), checking for any existing damp, rot or structural issues, measuring the elevations accurately, and identifying any awkward details - windows, doors, soil pipes, meter boxes, roof junctions and corners.
If existing cladding is being removed rather than overlaid, the survey also establishes what is behind the boards and whether the breather membrane is intact or needs replacing. Skipping this step and ordering materials blind is a false economy - the wrong quantity, the wrong fixing depth or an unexpected substrate issue can stall a job midway through.
Accurate measurements from this visit also allow a proper material takeoff, which avoids over-ordering or running short at a critical detail.
Once the wall build-up and dimensions are confirmed, the right material and system can be specified. The choice between timber, composite, fibre cement or metal is based on the building, the owner's preferences, the budget and any planning constraints. The profile of the boards (featheredge, tongue-and-groove, rainscreen, flat panel) affects both the look and the level of weather protection.
At this stage the full specification should be agreed in writing: board material and treatment, batten size and spacing, membrane type, fixing type (stainless steel is the correct choice for all exterior cladding), and how every junction and detail will be handled. Do not allow vague descriptions like "appropriate fixings" or "standard boarding" - the spec should be specific enough that a different installer could price it.
Most cladding work on two-storey or higher elevations needs scaffolding. This should be erected to the current safety standards, with sufficient working platforms to allow the boards to be fixed safely and inspected properly. Independent scaffolding is almost always better than ladder-and-hop-up work for a whole-elevation job.
Before boarding starts, the working area below is protected. Existing features such as light fittings, soil pipes and meter boxes are noted so they can be removed and refitted cleanly through the new cladding. Neighbours should be given reasonable notice if scaffolding affects a shared access or boundary.
Where existing boards are being stripped, this is done carefully to avoid damaging the membrane or wall behind. Boards, battens and old fixings all come off. The wall behind is then inspected properly for the first time. This is the point at which any hidden damp, rot in the frame, or membrane failure is found and dealt with.
Any rotten or damaged substrate must be repaired before the new system goes on. Boarding over a problem simply buries it. A good installer will show you what they find before proceeding.
A breather membrane is fixed to the wall before the battens go on. This layer is vapour-open, meaning it lets moisture vapour escape from the wall while preventing liquid water from getting through from outside. It is lapped and taped at joints to ensure continuity.
Treated timber battens are then fixed vertically (or in a counter-batten arrangement for horizontal boards) over the membrane. These battens create the ventilated cavity between the wall and the cladding - typically 25-50mm. This gap is essential: it allows air to circulate, moisture to dry out, and the system to perform as designed. Battens must be fixed into the structural wall, not just into render, and the fixings must be long enough to achieve adequate pull-out strength.
Boards are fixed from the bottom of the wall upwards. The bottom course is the most critical - it sets the level for everything above and must be detailed correctly to prevent water and pests from entering the cavity at the base. A starting fillet or back-cut is used to give the first board the correct projection angle where featheredge profile is used.
Each board is fixed with stainless steel fixings at every batten. The fixing point, fixing depth and board overlap are all specified rather than guessed. Boards must not be over-fixed (which causes splitting) or under-fixed (which allows boards to bow and lift in wind).
At windows, doors and other junctions, purpose-made trims, flashings or sealant details are fitted to direct water away from the wall. These junctions are the most likely point of failure on any cladding system, so the quality of detailing here matters more than almost anything else on the job.
Corners are handled with a mitred return, a purpose-made corner trim or a stop bead with sealant, depending on the system. All methods can look neat and perform well if done carefully.
With access already in place, the soffits, fascias and bargeboards are sensibly tackled at the same time if they need attention. These are the painted or capped timber components at roof level and are subject to the same weathering. Replacing them while the scaffold is up avoids re-erecting access later for a related job.
External painting of other surfaces can also be carried out at this stage efficiently.
Once all boards are fixed and all junctions detailed, the whole elevation is checked - board alignment, fixing tightness, junction sealing, trim condition and any paint or primer touchups needed where cuts were made on site. Any boards that have been marked or scratched during installation are cleaned or touched up.
All timber waste, off-cuts, packaging and scaffolding ties are cleared from the site. The scaffold comes down only after the installation has been signed off, not before. Leaving the scaffold up to check the finished work at height is a practical step worth requesting explicitly.
At completion, you should have a clear view of every elevation from ground level, all trims and junctions in good order, and no open gaps, missing sealant or exposed membrane visible at any point.
Ask for the full specification in writing before any work begins. Confirm that stainless steel fixings will be used throughout, that a breather membrane is included, and that battens are treated. Ask how each junction at windows and rooflines will be handled. A contractor who gives clear answers to these questions is one who knows what they are doing.
To discuss a cladding project on your Saffron Walden property, call Cambridge Roofers for a survey and a clear breakdown of what the work involves.